LEAD Action News

LEAD Action News vol 7 no 3, 1999, ISSN 1324-6011
Incorporating Lead Aware Times ( ISSN 1440-4966) and Lead Advisory Service News ( ISSN 1440-0561)
The journal of The LEAD (Lead Education and Abatement Design) Group Inc.

Search this site
 
Search tips 
What's New

About Us
Contact Us
Council Lead Project
egroups
Library-Fact Sheets  
Home Page
Media Releases  
Newsletters
Q&A
Referral Lists
Reports
Site Map
Slide Shows-Films  
Subscribe-Donate
Useful Links

Visitor Number

 

The Formation of ADRA

By Elizabeth O'Brien, ADRA Development Committee

In August 1999 over 50 ceiling dust contractors from around Australia were invited by The LEAD Group to a meeting to discuss a proposal by the Lead Reference Centre, The LEAD Group and a number of ceiling dust contractors in Sydney, that ceiling dust contractors set up their own association. At the proposal meeting the name Australian Dust Removalists Association (ADRA) was chosen and the date was set for the inaugural meeting of 5th October 1999. Again, all ceiling dust contractors in The LEAD Group's database were invited to the inaugural meeting and at that meeting it was decided that a Development Committee be formed to get the association started and to clarify and begin to implement its role and goals.

The ADRA Development Committee consists of 5 members (with no two members from the same dust removal company):

Peter Kearns of the new Lead Dust Centre
Chris Lawrence of Insulvac
Colin Rule of Lead Alert
John Kessey of Australian Lead Free Services
Elizabeth O'Brien of The LEAD Group

The ADRA Development Committee has set about investigating training possibilities for ceiling dust contractors and deciding on a structure or affiliation that will help achieve the following:

Certified training for ceiling dust contractors and requests to Standards Australia and WorkSafe (National Occupational Health and Safety Commission) to fast track the development of a Standard and Code of Practice on Building Cavity Dust Removal which between them includes:

  • guidance on circumstances which trigger the removal of building cavity dust

  • how to remove it,

  • equipment required,

  • waste recycling and / or disposal,

  • clearance guidelines or other methods of determining the safety of the property for inhabitants during and following the dust removal process, and

  • health monitoring requirements for ceiling dust contractors and other building, demolition and emergency workers who are regularly exposed to building cavity dust.

At its inaugural meeting on 26th October 1999, the ADRA Development Committee drafted a Code of Practice for the association to address the majority of the six points listed above, and agreed on a financial support mechanism for the association during its development phase.

At the second meeting of the Development Committee on 9th November 1999, CTI Consultants presented a proposal for an ADRA-accredited training course to be developed before April 2000 for the limited market of around 50 dust contractors. Representatives of the Lead Reference Centre (LRC) (a part of the NSW EPA) and WorkCover NSW also joined the discussion and the draft Code of Practice was able to be distributed to all ceiling dust contractors with the minutes of the meeting. WorkCover has already provided comments on the draft and it will be attached to the WorkCover Guidelines on Dust Removal due out at the end of 1999. At the NSW Lead Service Planning Meeting (12th November, 1999) meeting attended by Elizabeth O'Brien the EPA's Graeme Head made it clear that ADRA would need to make it's own approaches to each relevant government body (eg Waste Section of NSW EPA, WorkCover Authority, TAFE, Standards Australia) as the Lead Reference Centre is closing and lead issues are being "mainstreamed" back into each relevant government department.

Graeme Head, now Assistant Director General of the EPA, (in charge of waste and contaminated sites policies) agreed to meet with one member of the ADRA Development Committee to discuss the ceiling dust issues raised by The LEAD Group in a letter to Environment Minister Bob Debus. A fact sheet on waste disposal was drafted by Patricia Parkinson, Master of Environmental Law, at the Lead Advisory Service for discussion at the meeting. Graeme Head viewed favourably the desire and effort at simplifying the EPA's waste guidelines in a special publication for ceiling dust contractors. Education about ceiling dust for renovators was also suggested as a possibility by Graeme.

The second full ADRA meeting was held on 23rd November 1999 and representatives of ARCA Asbestos Removal Contractors Association (affiliated with the Master Builders Association) and BISCO were asked to write their affiliation offers for the Committee to review on 14th Dec 1999. TAFE advised that if training for ceiling dust removalists was made mandatory in regulation (like asbestos training is) and if 2000 contractors looked like attending the course in the next few years, then they could offer cheaper training than CTI, some time down the track.

Contents | Previous Item | Next Item

About Us | Contact Us | Council LEAD Project | egroups | Library - Fact Sheets | Home Page | Media Releases | Newsletters
 Q & A | Referral lists | Reports | Site Map | Slide Shows - Films | Subscription | Useful Links |  Search this Site

Last Updated 10 October 2011
Copyright © The LEAD Group Inc. 1991 - 2011
PO Box 161 Summer Hill NSW 2130 Australia
Phone: +61 2 9716 0014